Piedra Redonda Gas Field

FOCUS AREA 3 – UNDEVELOPED GAS FIELD WITH UPSIDE

Piedra Redonda Gas Field

  • Discovery well C-18-X drilled in 1978 in 55m of water.
  • Well flowed at maximum rate of 8.2 million standard cubic feet per day (mmscf/d) recovering 128 mmscf during an extended 60 day well test period.
  • Netherland, Sewell & Associates, Inc. (NSAI) resource estimate
  • 2C Contingent Resources of 404 billion cubic feet (Bcf) plus
  • 2U Prospective Resources# of 2.2 trillion cubic feet (Tcf) of gas
  • Low-risk upside in area updip to north-east of discovery well.
  • Existing gas-to-power feasibility studies will be reviewed in light of the information to be provided by the reprocessed seismic data and positive developments in gas market since previous Piedra Redonda evaluation.
  • 3D seismic data over the Piedra Redonda gas field are currently being reprocessed with delivery expected mid-year.
  • The wider Mancora gas play is unexplored within the TEA area and further work will be undertaken to better understand the potential for follow on discoveries.
Piedra1
  • #Cautionary Statement: The estimated quantities of gas that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrocarbons. Further important cautionary statements are contained in the Disclaimers & Disclosures