Piedra Redonda Gas Field

FOCUS AREA 3 – UNDEVELOPED GAS FIELD WITH UPSIDE

Piedra Redonda Gas Field

  • Discovery well C-18-X drilled in 1978 in 55m of water.
  • Well flowed at maximum rate of 8.2 million standard cubic feet per day (mmscf/d) recovering 128 mmscf during an extended 60 day well test period.
  • Netherland, Sewell & Associates, Inc. (NSAI) resource estimate
  • 2C Contingent Resources of 404 billion cubic feet (Bcf) plus
  • 2U Prospective Resources# of 2.2 trillion cubic feet (Tcf) of gas
  • Low-risk upside in area updip to north-east of discovery well.
  • Existing gas-to-power feasibility studies will be reviewed in light of the information to be provided by the reprocessed seismic data and positive developments in gas market since previous Piedra Redonda evaluation.
  • 3D seismic data over the Piedra Redonda gas field are currently being reprocessed with delivery expected mid-year.
  • The wider Mancora gas play is unexplored within the TEA area and further work will be undertaken to better understand the potential for follow on discoveries.
Piedra1
WP Table Builder
WP Table Builder
  • #Cautionary Statement: The estimated quantities of gas that may potentially be recovered by the application of a future development project(s) relate to undiscovered accumulations. These estimates have both a risk of discovery and a risk of development. Further exploration appraisal and evaluation is required to determine the existence of a significant quantity of potentially recoverable hydrocarbons. Further important cautionary statements are contained in the Disclaimers & Disclosures